For an overlay on an existing pavement, the degree of surface preparation is generally dependent on the condition and type of that existing pavement. Basically, the existing pavement should be structurally sound, level, clean and capable of bonding to the overlay. To meet these prerequisite conditions, the existing pavement is usually repaired, leveled, cleaned and then coated with a binding agent.
